Loan support for 30 MWe solar power plant project in Eğil
At the “COP31 Türkiye Platform Launch and Signing Ceremony with International Organisations”, attended by Diyarbakır Metropolitan Municipality Co-Mayor Serra Bucak, it was announced that loan financing had been secured through cooperation between the Asian Development Bank and İller Bankası for the 30 MWe solar power plant project to be implemented by the General Directorate of DİSKİ in Eğil.
Diyarbakır Metropolitan Municipality Co-Mayor Serra Bucak attended the “COP31 Türkiye Platform Launch and Signing Ceremony with International Organisations”, held as part of COP31. At the event, which was attended by Minister of Environment, Urbanisation and Climate Change Murat Kurum and mayors, financial support for local government projects was announced.
At the ceremony, Minister Kurum announced that loan financing had been secured through cooperation between the Asian Development Bank and İller Bankası for the solar power plant project that the General Directorate of the Diyarbakır Water and Sewerage Administration (DİSKİ) plans to establish in the district of Eğil.
To be built on a 520-decare site
Approved by the Ministry of Environment, Urbanisation and Climate Change, the project will be implemented on a 520-decare site at plot 14, block 129, in the Dere neighbourhood of Eğil.
The 30 MWe power plant will use 66,000 solar panels, each with a capacity of 545 Wp, and 120 inverters, each with a capacity of 250 kWe. The plant is expected to generate approximately 62,947,500 kWh of electricity annually.
An ecological approach will be adopted
The project will be implemented using environmentally friendly methods, with the General Directorate of DİSKİ ensuring that its implementation causes no harm to local residents, animals or the natural environment.
Aiming to increase renewable energy production, the General Directorate of DİSKİ will continue to pursue environmentally friendly projects across the city, guided by an ecological approach.
